Planning Your Dream Kitchen or BathA new kitchen (followed by the bathroom) is often the 2nd most expensive purchase after the house itself and, in many cases, it is the most frequently used room in the home. Adding space to your home or improving existing living conditions can be a traumatic time. However, if you plan properly, it doesn't have to be. This is why the Planning Phase of a remodel is so important. It is the crucial step to the success of any remodeling adventure—it sets the stage for the entire project. |
Step 1: Starting The Process
- Visit one of our two showrooms in San Diego or Encinitas, to learn more and to view our products and services.
- We will setup a FREE in-house consultation at your home.
- We will spend as much time as needed at your home going over your ideas for your new project.
Step 2: The Design Process
- During the in-house consultation we will do exact measurements and take pictures of your existing area.
- We will go back to our showroom to design your project, combining our ideas with your desires.
- We will set up an appointment with you to present the design. If the design is approved, we will carefully check every aspect of your project, sign a detailed contract (at this time a deposit is required).
- You will be provided with a set of plans and a list of the appliance sizes you will need in your new kitchen. Because your project is our priority, we can meet with you at the appliance stores to help select the ideal appliances.
- Within a couple of days your designer and our in-house draftsman will visit your home to do the final measurements.
- We will finalize the plans at this time, adding any changes you have.
- The draftsman and your designer will finish putting the final touches on your project, and the office will call you with a start date and a completion date.
Step 3: The Installation Process
- A week before
the start date your personal project manager will come to your home,
walk you through the process and make sure nothing was overlooked. He will provide you with his personal
contact information so that you can reach him at anytime. Please
inform him of any special instructions you have (portable toilets needed,
garage space available, special access to the project, etc.)
NOTE: Leave your refrigerator full; we will move it to a temporary location until we install your new refrigerator. You can then unload the old refrigerator and we will remove it or move it to a new location. - Day one: demo crew arrives, first 2 to 3 hours is dedicated to floor protection, we will place plastic over any items needed and will remove all debris after demolition is complete.
- Day two: the installers assigned to your project arrive to go through the project with you and your project manager, and then the fun begins. The following four days will be based around all electrical, plumbing and framing that needs to be done.
- The next two to three weeks installation will be in progress, your designer will consistently check in on the status to make sure all plans are being followed and that you are happy with the process. If you have any concerns at any time during the process please notify your installer or project manager, we will take care of it right away.
- By the end of the last week, once your project is competed we will do a walk through with you. The site will be cleaned, if needed we will bring in a cleaning service at no additional charge.
Project Completion!
- Upon completion of your project the remainder of your balance will be due, and you can begin to enjoy your beautiful new kitchen.
* The above remodeling process is based on a $20-$50k remodeling project. Below is a project completion guarantee time table based on project budgets. Guaranteed completion time may very depending on project details; a formal guaranteed completion date will be provided to you with project details.
| Remodeling Project Cost | Completion Guarantee |
| $20k - $50k | 3 - 5 Weeks |
| $51k - $75k | 6 Weeks |
| $76k + | 10 Weeks |